No. |
Uraian Pekerjaan |
Volume |
Satuan |
Harga Satuan ( Rp.) |
Jumlah Harga ( Rp.) |
||
|
I. |
Pekerjaan Persiapan |
|
|
|
|
||
|
1 |
Listrik Kerja |
10.00 |
bln |
385,000.00 |
3,850,000.00 |
||
|
2 |
Pembersihan Setiap
Hari dan Akhir Proyek |
426.89 |
m2 |
26,225.28 |
11,195,421.29 |
||
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
||
|
|
|
|
Jumlah Harga -
I. |
|
|
Rp. |
14,695,421.29 |
|
II. |
Pekerjaan Pondasi |
|
|
|
|
||
|
1 |
Galian Tanah, Elevasi MTA -10 Cm |
|
|
|
|
||
|
|
->Pondasi Plate Setempat, Elevasi
Bawah -100 Cm |
29.07 |
m3 |
110,885.18 |
3,223,432.04 |
||
|
|
->Tie Beam, Elevasi Atas -23,5 Cm |
15.92 |
m3 |
110,885.18 |
1,765,706.70 |
||
|
|
->Pondasi Plate Setempat, Elevasi
Bawah -100 Cm |
1.45 |
m3 |
388,208.88 |
564,261.61 |
||
|
|
->Tie Beam, Elevasi Atas -23,5 Cm |
1.49 |
m3 |
388,208.88 |
577,732.46 |
||
|
|
|
|
|
|
|
||
|
2 |
Urugan Pasir
di Atas Tanah Padat Tebal 5 Cm |
|
|
|
|
||
|
|
->Pondasi Plate Setempat, Elevasi Bawah
-100 Cm |
1.49 |
m3 |
359,907.29 |
535,722.00 |
||
|
|
->Tie Beam, Elevasi Atas -23.5 Cm |
2.98 |
M3 |
359,907.29 |
1,071,228.05 |
||
|
|
|
|
|
|
|
||
|
3 |
Lantai Kerja
di Atas Urugan
Pasir Spesi 1 : 5, Tebal 5 Cm |
|
|
|
|
||
|
|
->Pondasi Plate Setempat, Elevasi
Bawah -100 Cm |
29.77 |
m2 |
53,986.65 |
1,607,182.58 |
||
|
|
->Tie Beam, Elevasi Atas -23,5 Cm |
59.53 |
m2 |
53,986.65 |
3,213,717.32 |
||
|
|
|
|
|
|
|
||
|
4 |
Pembesian Pondasi
Plate Setempat Mutu U-30 |
|
|
|
|
||
|
|
->Type F2 ...Ukuran 60X60X20…..5 Unit… 230,69 Kg/m3 |
90.18 |
kg |
16,570.05 |
1,494,219.24 |
||
|
|
->Type F1 ...Ukuran 100X100X20…..22 Unit. 218,80 Kg/m3 |
713.97 |
kg |
16,570.05 |
11,830,555.94 |
||
|
|
|
|
|
|
|
||
|
5 |
Bekisting Pondasi
Plate Setempat Pas. Bata 1:5 di Dalam Tanah |
|
|
|
|
||
|
|
->Type F2 ...Ukuran 60X60X20…..5 Unit |
0.49 |
m2 |
130,523.88 |
63,956.70 |
||
|
|
->Type F1 ...Ukuran 100X100X20…..22 Unit |
5.32 |
m2 |
130,523.88 |
694,387.04 |
||
|
|
|
|
|
|
|
||
|
6 |
Cor Beton Pondasi Plate Setempat Mutu Site Mix 1:2:3 |
|
|
|
|
||
|
|
->Type F2 ...Ukuran 60X60X20…..5 Unit |
0.63 |
m3 |
1,261,938.92 |
795,021.52 |
||
|
|
->Type F1 ...Ukuran 100X100X20…..22 Unit |
5.32 |
m3 |
1,261,938.92 |
6,718,562.80 |
||
|
|
|
|
|
|
|
||
|
7 |
Bekisting Tie Beam Pas. Bata 1:5 di Dalam
Tanah |
|
|
|
|
||
|
|
->Type TB1…...Ukuran 15X30…..Panjang 85,04 m1 |
51.02 |
m2 |
130,523.88 |
6,659,850.42 |
||
|
|
|
|
|
|
|
||
|
8 |
Pembesian Tie Beam Mutu U-30 |
|
|
|
|
||
|
|
->Type TB1…...Ukuran 15X30…..Panjang 85,04 m1 142,97 Kg/m3 |
547.13 |
kg |
16,570.05 |
9,065,996.86 |
||
|
|
|
|
|
|
|
||
|
9 |
Cor Tie Beam Mutu Site Mix 1:2:3 |
|
|
|
|
||
|
|
->Type TB1…...Ukuran 15X30…..Panjang 85,04 m1 |
3.83 |
m3 |
1,261,938.92 |
4,829,187.85 |
||
|
|
|
|
|
|
|
||
|
10 |
Urug Tanah |
|
|
|
|
||
|
|
->Ex Galian
Pondasi Plate Setempat |
20.84 |
m3 |
54,153.23 |
1,128,499.06 |
||
|
|
->Tie Beam Lantai Dasar….Elv. 00 |
18.24 |
m3 |
54,153.23 |
987,813.31 |
||
|
|
|
|
|
|
|
||
|
|
|
|
Jumlah Harga -
II. |
|
|
Rp. |
57,051,682.12 |
|
No. |
Uraian Pekerjaan |
Volume |
Satuan |
Harga Satuan ( Rp.) |
Jumlah Harga ( Rp.) |
|
III. |
Pekerjaan Struktur |
|
|
|
|
|
|
Lantai Dasar….Elv. 00 |
|
|
|
|
|
1 |
Bekisting Kolom Beton
Plywood T.9 mm,…….H.360 + 100 cm |
|
|
|
|
|
|
->Type K1 ...Ukuran 30X30…........ 22 Unit |
118.80 |
m2 |
124,981.30 |
14,847,779.02 |
|
|
->Type K2 ...Ukuran 20X20............ 5 Unit |
18.00 |
m2 |
104,151.09 |
1,874,719.57 |
|
2 |
Pembesian Kolom Mutu U-30 |
|
|
|
|
|
|
->Type K1 ...Ukuran 30X30……..………..22 Unit… 238,24 Kg/m3 |
2,094.43 |
kg |
16,570.05 |
34,704,774.83 |
|
|
->Type K2 ...Ukuran 20X20……..………..5 Unit… 247,63 Kg/m3 |
220.08 |
kg |
16,570.05 |
3,646,682.04 |
|
3 |
Cor Kolom Beton Bertulang Mutu Site Mix 1:2:3 |
|
|
|
|
|
|
->Type K1 ...Ukuran 30X30............ 22 Unit |
8.91 |
m3 |
1,261,938.92 |
11,243,875.75 |
|
|
->Type K2 ...Ukuran 20X20............ 5 Unit |
0.90 |
m3 |
1,261,938.92 |
1,135,745.03 |
|
4 |
Bekisting Balok Beton
Plywood T.9 mm |
|
|
|
|
|
|
->Type B1...Ukuran 15X35…..Panjang 46,43 m1 |
21.36 |
m2 |
89,349.07 |
1,908,340.68 |
|
|
->Type B1A/B1AX...Ukuran 15X35…..Panjang 125,44 m1 |
57.70 |
m2 |
89,349.07 |
5,155,655.80 |
|
|
->Type B2...Ukuran 15X30…..Panjang 26,30 m1 |
9.47 |
m2 |
89,349.07 |
845,957.00 |
|
|
->Type B3...Ukuran 15X25…..Panjang 5,00 m1 |
1.30 |
m2 |
89,349.07 |
116,153.79 |
|
5 |
Pembesian Balok Beton
Mutu U-30 |
|
|
|
|
|
|
->Type B1...Ukuran 15X35…..Panjang 46,431 m1 264,84 Kg/m3 |
521.01 |
kg |
16,570.05 |
8,633,203.71 |
|
|
->Type B1A/B1AX...Ukuran 15X35…..Panjang 125,44 m1............................................................................................. 325,25 Kg/m3 |
1,669.04 |
kg |
16,570.05 |
27,656,031.81 |
|
|
->Type B2...Ukuran 15X30…..Panjang 26,3 m1 238,29 Kg/m3 |
169.21 |
kg |
16,570.05 |
2,803,806.65 |
|
|
->Type B3...Ukuran 15X25…..Panjang 5,00 m1 314,23 Kg/m3 |
30.64 |
kg |
16,570.05 |
507,663.01 |
|
6 |
Cor Balok Beton Bertulang Mutu Site Mix 1:2:3 |
|
|
|
|
|
|
->Type B1...Ukuran 15X35…..Panjang 46,43 m1 |
1.60 |
m3 |
1,261,938.92 |
2,021,461.46 |
|
|
->Type B1A/B1AX...Ukuran 15X35…..Panjang 125,44 m1 |
4.33 |
m3 |
1,261,938.92 |
5,461,267.81 |
|
|
->Type B2...Ukuran 15X30…..Panjang 26,3 m1 |
0.71 |
m3 |
1,261,938.92 |
896,102.83 |
|
|
->Type B3...Ukuran 15X25…..Panjang 5,00 m1 |
0.10 |
m3 |
1,261,938.92 |
123,039.04 |
|
7 |
Bekisting dan Perancah Plat Lantai/Atap/Canopy Beton Plywood T.9 mm |
|
|
|
|
|
|
->Type A…..…..Tebal 12 cm…..Luas 213.22 m2 |
213.22 |
m3 |
177,652.54 |
37,879,188.58 |
|
8 |
Pembesian Plat
Lantai/Atap/Canopy Beton Mutu U-30 |
|
|
|
|
|
|
->Type A…..…..Tebal
12 cm…..Luas 213.22 m2…....91.11 Kg/m3 |
2,331.25 |
kg |
16,570.05 |
38,628,887.25 |
|
9 |
Cor Plat Lantai/Atap/Canopy Beton Mutu Site Mix 1:2:3 |
|
|
|
|
|
|
->Type A…..…..Tebal
12 cm…..Luas 213.22 m2 |
25.59 |
m3 |
1,261,938.92 |
32,288,571.89 |
|
10 |
Bekisting dan Perancah Tangga Plywood T.9 mm |
|
|
|
|
|
|
->Plat
Tangga + Anak Tangga ..Tebal 23.17
cm…Luas 13.57 m2 |
13.57 |
m2 |
154,040.47 |
2,090,390.94 |
|
|
->Plat
Bordes + Plat Kolom …..Tebal 15
cm….....Luas 2.55 m2 |
2.55 |
m2 |
154,040.47 |
392,129.26 |
|
11 |
Pembesian Tangga Mutu U-30 |
|
|
|
|
|
|
->Plat
Tangga + Anak Tangga ...119.55 Kg/m3 ->Plat
Bordes + Plat Kolom ...145.24 Kg/m3 |
145.97
26.59 |
kg kg |
16,570.05
16,570.05 |
2,418,723.74
440,633.38 |
|
12 |
Cor Tangga Beton Bertulang Mutu Site Mix 1:2:3 |
|
|
|
|
|
|
->Plat
Tangga + Anak Tangga ..Tebal 23.17
cm…Luas 13.57 m2 ->Plat
Bordes + Plat Kolom …..Tebal 15
cm….....Luas 2.55 m2 |
1.22 0.18 |
m3 m3 |
1,261,938.92
1,261,938.92 |
1,540,839.84
231,053.13 |
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Bekisting Balok Beton Plywood T.9 mm H=275 cm |
|
|
|
|
|
|
->Type K1...Ukuran 30X30............ 24
Unit |
157.25 |
m2 |
104,151.09 |
16,377,550.19 |
|
|
->Type K3...Ukuran 15X15............ 4 Unit |
24.13 |
m2 |
104,151.09 |
2,512,957.44 |
|
2 |
Pembesian Kolom Mutu U-30 |
|
|
|
|
|
|
->Type K1...Ukuran 30X30……..………..24 Unit… 279,51 Kg/m3 |
2,267.37 |
kg |
16,570.05 |
37,570,450.02 |
|
|
->Type K3...Ukuran 15X15……..………..4 Unit… 304,36 Kg/m3 |
370.34 |
kg |
16,570.05 |
6,136,592.30 |
|
3 |
Cor Kolom Beton Bertulang Mutu Site Mix 1:2:3 |
|
|
|
|
|
|
->Type K1...Ukuran 30X30............ 24
Unit |
8.11 |
m3 |
1,261,938.92 |
10,236,848.50 |
|
|
->Type K3...Ukuran 15X15............ 4 Unit |
1.22 |
m3 |
1,261,938.92 |
1,535,527.27 |
|
4 |
Bekisting Balok Beton
Plywood T.9 mm |
|
|
|
|
|
|
->Type RB1...Ukuran 20X50…..Panjang 31,49 m1 |
23.93 |
m2 |
89,349.07 |
4,276,093.34 |
|
|
->Type RB2...Ukuran 20X40…..Panjang 102,00 m1 |
57.12 |
m2 |
89,349.07 |
10,207,237.81 |
|
5 |
Pembesian Balok Beton
Mutu U-30 |
|
|
|
|
|
|
->Type RB1...Ukuran 20X50…..Panjang 31,49 m1 201,89 Kg/m3 |
1,271.35 |
kg |
16,570.05 |
21,066,322.27 |
|
|
->Type RB2...Ukuran 20X40…..Panjang 102,00 m1 129,94 Kg/m3 |
2,120.59 |
kg |
16,570.05 |
35,138,311.64 |
|
6 |
Cor Balok Beton Bertulang Mutu Site Mix 1:2:3 |
|
|
|
|
|
|
->Type RB1...Ukuran 20X50…..Panjang 31,49 m1 |
6.30 |
m3 |
1,261,938.92 |
7,946,609.64 |
|
|
->Type RB2...Ukuran 20X40…..Panjang 102,00 m1 |
16.32 |
m3 |
1,261,938.92 |
20,594,843.13 |
|
7 |
Bekisting dan Perancah
Plat Lantai/Atap/Canopy Beton Plywood T.9 mm |
|
|
|
|
|
|
->Type A…..…Tebal 12 cm…..Luas 156,76 m2….Plat Atap Beton |
156.76 |
m2 |
177,652.54 |
27,848,938.37 |
|
8 |
Pembesian Plat Lantai/Atap/Canopy Beton
Mutu U-30 |
|
|
|
|
|
|
->Type A…..…Tebal 12 cm…..Luas 156,76 m2 91,11 Kg/m3 |
1,713.94 |
kg |
16,570.05 |
28,400,119.98 |
|
9 |
Cor Plat Lantai/Atap/Canopy Beton Mutu Site Mix 1:2:3 |
|
|
|
|
|
|
->Type A…..…Tebal 12 cm…..Luas 175,00
m2 |
18.81 |
m3 |
1,261,938.92 |
23,738,693.53 |
|
10 |
Cor Talang
Air |
|
|
|
|
|
|
Pembesian
Beton Mutu U-30 |
2,000.00 |
kg |
16,570.05 |
33,140,093.55 |
|
|
Bekisting
dan Perancah Beton Plywood T.9 mm |
100.00 |
m2 |
104,151.09 |
10,415,108.74 |
|
|
Cor Beton
Mutu Site Mix 1:2:3 |
4.00 |
m3 |
1,261,938.92 |
5,047,755.67 |
|
Jumlah Harga - III. Rp. 541,682,731.22 |
|||||
|
No. |
Uraian Pekerjaan |
Volume |
Satuan |
Harga Satuan ( Rp.) |
Jumlah Harga ( Rp.) |
|
IV. |
Pekerjaan Atap |
|
|
|
|
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Kubah
Bahan GRC dengan
Perkuatan Pipa Vertikal Galvanish 3" Tebal 2,5 mm, dan Pipa Horizontal Galvanish 2,5" Tebal
2,5 mm |
67.89 |
m2 |
1,296,000.00 |
87,979,885.71 |
|
Jumlah Harga - IV. Rp. 87,979,885.71 |
|||||
|
V. |
Pekerjaan Lantai |
|
|
|
|
|
|
Lantai Dasar….Elv. 00 |
|
|
|
|
|
1 |
Granitotile 60/60 Type Homogenius LS 66 M32 Ex. Cina, Spesi 1 : 5, T. 2,5 cm |
|
|
|
|
|
|
->Bordes Tangga
Type Tangga Utama… Luas : 1,20 m2 |
0.60 |
m2 |
226,119.32 |
135,812.92 |
|
|
->Anak Tangga
Type Tangga Utama… Panjang : 29,45 m1 |
14.73 |
m1 |
157,763.62 |
2,323,069.28 |
|
|
Perbaikan Bekas Lantai 1 |
|
|
|
34,000,000.00 |
|
2 |
Plint 10 Cm Type Homogenius LS 66 M32 Ex. Cina, Spesi 1 : 5, T. 2,5 cm |
|
|
|
|
|
|
-> Tangga Type Tangga
Utama Panjang : 30,45 m1 |
15.83 |
m1 |
54,585.91 |
863,821.99 |
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Granitotile 60/60 Type Homogenius LS 66 M32 Ex. Cina, Spesi 1 : 5, T. 2,5 cm |
|
|
|
|
|
|
->T. Sholat Lt. 2
dan Gudang,............... Luas : 135,30 m2 |
135.30 |
m2 |
226,119.32 |
30,593,943.84 |
|
2 |
Plint 10 Cm Type Homogenius LS 66 M32 Ex. Cina, Spesi 1 : 5, T. 2,5 cm |
|
|
|
|
|
|
->T. Sholat Lt. 2 dan Gudang………Panjang : 67,80 m1 |
67.80 |
m1 |
54,585.91 |
3,700,924.56 |
|
3 |
Screeding Lantai Beton,
Spesi 1 : 4, T. 3 cm + Aci T. 2 mm |
|
|
|
|
|
|
->Dak Beton ...Elv. +3,55… Luas : 233,22 m2 |
213.22 |
m2 |
88,054.39 |
18,775,014.05 |
|
4 |
Plester/Aci Tanggulan di Atas Dak Beton H. 20 cm Adukan 1 : 4 |
|
|
|
|
|
|
->Dak Beton ...Elv.
+3,55………Panjang : 159,87
m1 |
131.87 |
m1 |
100,057.06 |
13,194,582.70 |
|
5 |
Water Proofing Lantai dan Dinding
H. 20 Cm Type Sika-Top
107 |
|
|
|
|
|
|
->Dak Beton ...Elv.
+3,55, ……Luas : 265,19 m2 |
239.15 |
m2 |
48,600.00 |
11,644,305.48 |
|
|
Dak Atap…. Elv. +6,65 |
|
|
|
|
|
1 |
Screeding Lantai Beton,
Spesi 1 : 4, T. 3 cm + Aci T. 2 mm |
|
|
|
|
|
|
-> Dak Atap Beton 1,.................. Luas : 175,00 m2 |
156.76 |
m2 |
88,054.39 |
13,803,469.11 |
|
2 |
Plester/Aci Tanggulan di Atas Dak Beton H. 20 cm Adukan 1 : 4 |
|
|
|
|
|
|
-> Dak Atap Beton 1………Panjang : 62,00 m1 |
91.00 |
m1 |
100,057.06 |
9,115,198.28 |
|
3 |
Water Proofing Lantai dan Dinding
H. 20 Cm Type Sika-Top
107 |
|
|
|
|
|
|
-> Dak Atap Beton 1,.................. Luas : 187,40 m2 |
156.76 |
m2 |
59,019.59 |
9,251,952.30 |
|
Jumlah Harga -V. Rp. 147,402,094.51 |
|||||
|
VI. |
Pekerjaan Dinding |
|
|
|
|
|
|
Lantai Dasar….Elv. 00 |
|
|
|
|
|
1 |
Plesteran Dinding Spesi 1 : 4 |
16.12 |
m2 |
77,722.36 |
1,252,575.56 |
|
|
->Bidang Plat Bawah
Tangga |
|
|
|
|
|
2 |
Acian Skimcoat Grey LM
200 T. 1.5 mm |
|
|
|
|
|
|
->Bidang Plat Bawah
Tangga |
16.12 |
m2 |
41,547.64 |
669,582.85 |
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Pasangan 1/2 Batu Bata Merah,
Spesi 1 : 4 |
|
|
|
|
|
|
->Bidang Pasangan s/d Elv. +6,65 |
253.50 |
m2 |
136,010.23 |
34,478,592.73 |
|
|
Pasangan Dinding GRC t. 2 Cm |
68.95 |
m2 |
1,083,442.84 |
74,705,550.48 |
|
2 |
Plesteran Dinding Spesi 1 : 4 |
|
|
|
|
|
|
->Bidang Pas. Dinding
s/d Elevasi Plafond, dan Pembatas Samping
Luar Kavling |
494.86 |
m2 |
73,098.15 |
36,173,350.59 |
|
3 |
Acian Skimcoat Grey LM 200 T. 1,5 mm |
|
|
|
|
|
|
->Bidang Plesteran Exclude
Pembatas Samping Luar Kavling |
494.86 |
m2 |
35,298.14 |
17,467,638.67 |
|
4 |
Plester/Aci Profil, Opening
Kusen Pintu/Jendela Aluminium/Besi, dan Ban-Banan |
|
|
|
|
|
|
->Opening Kusen Pintu/Jendela Aluminium/Besi dan di Atas Kusen Pintu/Jendela |
38.22 |
m1 |
60,841.55 |
2,325,364.10 |
|
5 |
Kolom Praktis 13X13: Pembesian, Tul. Pokok 4 Dia 8 ,
Sengkang Dia 6 - 20 cm, Bekisting dan Cor Site Mix 1:2:3 |
|
|
- |
|
|
|
-> Pertemuan, Pengakhiran,
Pengaku Pas. Bata…..5 Unit……H.275 cm |
13.75 |
m1 |
103,238.76 |
1,419,532.98 |
|
6 |
Ringbalk 10X15: Pembesian,
Tul. Pokok 4 Dia 8 , Sengkang Dia 6 -
20 cm, Bekisting dan Cor Site Mix
1:2:3 |
|
|
|
|
|
|
-> Tumpuan Atas
Kusen/Balok Canopy…...Panjang 7.02 m1 |
7.02 |
m1 |
88,899.14 |
624,071.96 |
|
7 |
Pekerjaan Railing ( Besi Hollow di Cat ) |
|
|
|
|
|
|
-> Di Tangga
Utama, Vide Tangga,
Area Void dan Railing Luar |
129.24 |
m1 |
1,020,000.00 |
131,820,136.19 |
|
8 |
Bidang Dinding GRC t. 2 Cm |
|
|
|
|
|
|
->Bidang Pas. Dinding
Tampak Depan |
68.95 |
m2 |
800,000.00 |
55,161,600.00 |
|
9 |
Bidang Dinding Kisi-Kisi Conwood |
|
|
|
|
|
|
->Bidang Pas. Dinding
TampakSamping |
61.56 |
m2 |
850,000.00 |
52,326,000.00 |
|
Jumlah Harga - VI. Rp. 408,423,996.11 |
|||||
|
No. |
Uraian Pekerjaan |
Volume |
Satuan |
Harga Satuan ( Rp.) |
Jumlah Harga ( Rp.) |
|
VII. |
Pekerjaan Plafond |
|
|
|
|
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Plafond Gypsum
9 mm Ex Star/Knauf Board Rangka Hollow
Galvanished |
|
|
|
|
|
|
->T.
Sholat Lt. 2… Luas : 58,71 m2 |
58.71 |
m2 |
95,400.00 |
12,907,620.00 |
|
|
->Area Tangga
dan Void.. Luas : 14,00 m2 |
14.00 |
m2 |
95,400.00 |
1,335,600.00 |
|
|
-> Luasan
Vide…. Luas : 40,35 m2 |
40.35 |
m2 |
95,400.00 |
3,849,390.00 |
|
2 |
Shadow Line (Tali Air Plafond ) Z Profile
Galvanis |
|
|
|
|
|
|
->T. Sholat
Lt. 2………Panjang : 57,14 m1 |
57.14 |
m1 |
21,000.00 |
1,423,800.00 |
|
|
->Teras LT. 2………Panjang : 37,80 m1 |
37.80 |
m1 |
21,000.00 |
462,000.00 |
|
|
->Area Tangga dan Void………Panjang : 22,00 m1 |
22.00 |
m1 |
21,000.00 |
900,900.00 |
|
|
-> Luasan
Vide………Panjang : 42,90 m1 |
42.90 |
m1 |
95,400.00 |
12,907,620.00 |
|
Jumlah Harga - VII. Rp. 20,879,310.00 |
|||||
|
VIII. |
Pekerjaan Kusen/Daun Pintu/Jendela & Aksesoris |
|
|
|
|
|
|
Lantai Dasar….Elv. 00 |
|
|
|
|
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Kusen Kayu Kamper Samarinda Oven, Daun Pintu
Kayu Kamper Samarinda Oven , Aksesoris Rel Pintu Geser + Kaca Mati, Kunci Ex Dekkson |
|
|
|
|
|
|
->Type P2 |
1.00 |
Unit |
11,350,200.00 |
11,350,200.00 |
|
2 |
Kusen Kayu
Kamper Samarinda Oven, Daun Pintu Engeerreng , Aksesoris Rel Pintu Geser + Kaca Mati, Kunci Ex Dekkson |
|
|
|
|
|
|
->Type P1 |
2.00 |
Unit |
5,875,277.44 |
11,750,554.88 |
|
2 |
Kusen Aluminium 3"", Daun Jendela
Kaca Mati, Kunci Ex Dekkson |
|
|
|
|
|
|
->Type J1 |
6.00 |
Unit |
2,564,520.00 |
15,387,120.00 |
|
Jumlah Harga - VIII. Rp. 38,487,874.88 |
|||||
|
IX. |
Pekerjaan Pengecatan |
|
|
|
|
|
|
Pengecatan Dinding, Listplank, Plafond, |
|
|
|
|
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Cat Dinding
Dalam, Listplang Vide, Plat Tangga
Ex.Catilac |
284.82 |
m2 |
17,400.00 |
8,610,564.00 |
|
2 |
Cat Dinding
Luar, Canopy Beton Dulux Weathersield |
103.38 |
m2 |
32,400.00 |
3,349,512.00 |
|
3 |
Cat
Plafond Luar/ Dalam
Ex Vinilex |
|
|
|
|
|
|
-> Cat Plafond |
142.86 |
m2 |
17,400.00 |
3,299,910.00 |
|
Jumlah Harga - IX. Rp. 15,330,195.72 |
|||||
|
X. |
Pekerjaan Listrik |
|
|
|
|
|
|
Lantai Dasar….Elv. 00 |
|
|
|
|
|
|
Lantai 2…. Elv. +3,6 |
|
|
|
|
|
1 |
Instalasi Penerangan Plafon Kabel NYM 2 x
2,5 Ex Eterna |
26.00 |
ttk |
240,000.00 |
6,240,000.00 |
|
2 |
Stop Kontak Kabel NYM 3 x 2,5 Ex Eterna |
10.00 |
ttk |
252,000.00 |
2,520,000.00 |
|
3 |
Instalasi Stop Kontak Pompa Air |
1.00 |
ttk |
372,000.00 |
372,000.00 |
|
4 |
Instalasi Stop Kontak AC |
8.00 |
ttk |
450,000.00 |
3,600,000.00 |
|
5 |
Panel Listrik Lt. 2 |
1.00 |
unit |
6,000,000.00 |
6,000,000.00 |
|
6 |
Down
Light 5"PhilipsLampu LED Down Ligt7.5W Eridani592625 |
24.00 |
bh |
330,000.00 |
7,920,000.00 |
|
7 |
Lampu Dinding By Owner (Hanya Upah Pasang) |
1.00 |
bh |
352,800.00 |
352,800.00 |
|
8 |
Lampu
Strip LED Indoor , Adaptor AC/DC Housing 25 mm Thick Ex China (Indirect Light) |
18.86 |
m1 |
51,000.00 |
961,714.29 |
|
9 |
Sakelar Engkel Ex Panasonic |
2.00 |
bh |
21,000.00 |
42,000.00 |
|
10 |
Sakelar Seri Ex. Panasonic |
4.00 |
bh |
28,200.00 |
112,800.00 |
|
11 |
Stop Kontak Biasa Ex Panasonic |
11.00 |
bh |
28,200.00 |
310,200.00 |
|
Jumlah Harga - X.Rp. 28,431,514.29 |
|||||
|
XI. |
Pekerjaan Sanitary dan Plumbing |
|
|
|
|
|
|
Plumbing |
|
|
|
|
|
1 |
Instalasi
Air Hujan |
|
|
|
|
|
|
-> Pipa 3"Type D Ex Rucika |
96.00 |
m1 |
70,512.74 |
6,769,222.77 |
|
|
-> Pipa 4"Type D Ex Rucika |
32.00 |
m1 |
94,572.74 |
3,026,327.59 |
|
2 |
Instalasi
Pipa Tembaga U/ AC |
80.00 |
m1 |
132,000.00 |
10,560,000.00 |
|
3 |
Instalasi
Pipa Tembaga U/ AC |
48.00 |
m1 |
101,353.94 |
4,864,989.03 |
|
4 |
Matrial
Bantu ( Knie, Sock, Lem , Seal Tape, Stop Kran dll ) |
1.00 |
ls |
1,320,768.00 |
1,320,768.00 |
|
|
Sanitary |
|
|
|
|
|
|
Dak Atap…. Elv. +6,65 |
|
|
|
|
|
1 |
Roof Drain Baja 3'' Ex Antasan…….Jumlah :14 Bh |
14.00 |
bh |
198,000.00 |
2,772,000.00 |
|
Jumlah HargaXI. Rp. 29,313,307.39 |
|||||
|
XII. |
Pekerjaan Lain-Lain |
|
|
|
|
|
1 |
Profil Di Dinding Luar |
1.00 |
Ls |
90,000,000.00 |
90,000,000.00 |
|
2 |
Menara Di Atas Dak Atap Uk.
2X2 Jumlah 3 UnitTinggi 8.594 M |
12.00 |
M2 |
7,500,000.00 |
90,000,000.00 |
|
3 |
Menara
Di Atas Dak Atap Uk. 2X2 Jumlah 1 UnitTinggi 13.9254 M |
4.00 |
M2 |
12,500,000.00 |
50,000,000.00 |
|
Jumlah Harga - XII. Rp 230,000,000.00 |
|||||
Tidak ada komentar: